Field Data Collection System (FDCS) Software
Version 4.3
6/7/2011
Overview
The GDOT Field Data Collection system is a program that assists GDOT testing technicians and certified contractor technicians in entering and sending field test data to GDOT.
Data is sent to the GDOT using the Web Upload feature.
Installation and Updates for FDCS
Field Data Collection System Client must be kept up to date. GDOT does not support older versions of this software. Attempting to Upload with an unsupported version will result in an error message directing the user to the Update webpage.
Windows 7 installs of FDCS v4.3 are not certified or supported by the Georgia Department of Transportation’s Information Technology Division.Furthermore, we do not currently provide technical support for installs of FDCS installed on Windows 7 computers. Preliminary testing of installs of FDCS v4.3 on computers running the Windows 7 operating system appears to be successful. If you choose to proceed with installing FDCS v4.3 on a Windows 7 computer, please note that you will receive error messages. During post install preliminary testing, all results indicate that FDCS v4.3 functions as designed. However, further testing must occur.
Note: The new FDCS v4.3 is now available. Uploads via previous versions can no longer be accepted. Existing tests completed, but not uploaded, via FDCS v4.2 will need to be re-entered and uploaded via FDCS v4.3.
Please download from the following selections:
NOTE: Users that experience an "Out of Memory" error when installing FDCS 4.3 need to download and install the Microsoft Jet 3.51 update.
Additional References
FDCS Support - Report problems with connections, upload, installation/updating, logon, error messages, incorrect results, data entry questions or other issues.
FDCS OMR Training Manuals - The training manual used in the FDCS training classes in Adobe Acrobat Format.
There are three manuals: User, Browser, Administrator.
Nuclear Gauge Update - Nuclear gauge calibration update file
TechDocs - Technical documents regarding the DOT 640/641and Portland Cement file formats for importing data.
GDOT Hot Mix Asphalt Technician Qualification Program - This document serves as the written policy for administration of the GDOT Hot Mix Asphalt Technician Qualification Program and provides an outline of the framework that the HMA TQP program is built on including training, examinations, qualifications, and conflict resolution. (Last revision: October 19, 2001)
Technician's Quarterly Newsletter - quarterly newsletter for our field technicians and contractors. Past editions of this newsletter are available in a archive zip file.
The Source - access test procedures.